EV charger installation quote

About 2 minutes on site. Answers become the quote.

Panel
What changes the price?
A long run, a pedestal, load management, and the permit.
What if the panel has no free spaces?
Panel may need a separate price.
Which photos should I take?
The panel, the parking spot, and the run path.
What does the client see?
They get the job link, not this checklist.