Panel upgrade quote

About 2 minutes on site. Answers become the quote.

Existing
What changes the price?
The new panel size, a surge protector, extra breakers, and the permit.
What if the meter has to move?
Meter move may need a separate price.
Which photos should I take?
Panel cover off, the meter, and the main disconnect.
What does the client see?
They get the job link, not this checklist.